How ordering works

Follow one visible path from request and capability review through fulfillment.

One controlled lifecycle

Know the current state and the next decision.

A request becomes a production order only after capability, price, proof, approval, deposit, schedule, quality, and fulfillment evidence are complete.

1
Customer Request stage

Request received

You provide the goal, product, quantity, options, personalization, artwork state, need-by date, budget, and fulfillment preference.

Exit: A complete request or a specific list of missing information.

2
Hays Custom Works Requires prior gate

Capability review

We verify source, material, method, equipment or partner, cost, capacity, safety, test needs, quality plan, and fulfillment risk.

Exit: Proceed, clarify, propose an alternative, place on hold, or decline.

3
Hays Custom Works Requires prior gate

Estimate

You receive the current products/options, setup/design, revisions, assumptions, tax and fulfillment basis, deposit, balance trigger, expiry, and change policy.

Exit: Accept the exact estimate version or request a revision.

4
Shared review Requires prior gate

Proofing

The exact design, placement, dimensions, color intent, product, quantities, sizes, and personalization are shown with physical-variation caveats.

Exit: Approve the exact proof version or submit consolidated changes.

5
Shared gate Requires prior gate

Deposit and schedule

Production waits for the required cleared deposit, approved proof, available materials, capacity, and a recorded committed date.

Exit: Release the approved order to production.

6
Hays Custom Works Requires prior gate

Production

The operator follows the approved traveler, recipe, material/lot, equipment settings, test result, and in-process checks.

Exit: Good units proceed; defects, holds, rework, or substitutions are recorded.

7
Hays Custom Works Requires prior gate

Quality and packing

Product/options, personalization, quantity, placement, finish, care, labels, packaging, and fulfillment are reconciled.

Exit: Authorized release or documented correction.

8
Shared handoff Requires prior gate

Fulfillment

Pickup, local delivery, or shipping follows the accepted cost, recipient, custody, tracking, exception, and recovery record.

Exit: Customer acceptance and order closeout.

Financial commitment

Accept an exact estimate before paying or producing.

A qualified request becomes a financial commitment only through a current, understandable estimate version—not an instant website price or an informal message.

Customer estimate template—not a price quote

What every estimate must show

Acceptance required
Required customer estimate sections
SectionRequired detail
Identity and validityEstimate ID/version, request/customer, ISO currency, issue date, expiry, cost-source effective date, preparer, reviewer, and immutable rendered-copy checksum.
Products and quantitiesExact product/SKU/source, material, colors, sizes/options, placements, personalization version, quantity, good/spare/test allowance, and approved substitutions.
Work linesDesign preparation, original design, setup, testing/sample, production, partner work, finishing, quality, packaging, sorting/labeling, and fulfillment.
Price adjustmentsCurrent quantity-tier basis, approved discount or credit, rush/capacity charge, partner cost, shipping or local delivery, and any excluded future work.
Tax basisTaxable categories and basis, jurisdiction, rate, dated source or professional review, exemption/resale record when accepted, rounding rule, and explicit no-tax-advice boundary.
Assumptions and riskSource availability, rights, proof/revisions, supplied-item boundary, spoilage/variation, capacity, committed-date dependencies, fulfillment, exclusions, and reprice triggers.
Totals and paymentSubtotal, discounts, taxable basis, tax, fulfillment, total, required deposit amount/due date, remaining balance, balance trigger/due date, and payment status.
Acceptance and changeExact accepted estimate version, customer identity/authority/time/channel, accepted terms, change-order rule, cancellation/refund boundary, and production-release consequences.

Exact money

Store every amount as an integer number of minor units with one ISO 4217 currency. Calculate line extensions, discounts, taxable basis, tax, deposit, payments, refunds, credits, and balance without binary floating-point money.

Tax review

The system records the dated tax source and calculation; it does not guess eligibility or provide tax advice. Missing, expired, contradictory, or unreviewed exemption/resale evidence keeps the applicable tax decision unresolved.

Deposit and balance

The estimate states whether a deposit is required, the exact amount and due date, what clearance releases, the remaining balance, its trigger, and which fulfillment or production states remain blocked while payment is pending or failed.

Controlled changes

A product, quantity, artwork, proof, personalization, material, method, date, tax, price, or fulfillment change creates a versioned change order with cost and schedule impact. Production remains held until required acceptance and payment gates are current.

Payment boundary: The application records approved provider references, signed event IDs, idempotency, expected amount/currency, accepted estimate/change version, status, and reconciliation. It must never store full card numbers, CVV, magnetic-stripe data, provider secrets, or unsafe raw payment payloads.
Exact approval boundary

Approve one immutable proof version.

The proof must make the product, design, placement, options, personalization, quantity, limitations, and approving authority unmistakable before production release.

Customer proof template—not an active order

What every approval view must contain

Approval required
Order
Stable order identifier and authenticated customer context
Proof
Immutable proof ID and version; superseded versions remain read-only
Products
Exact verified product/SKU, material, color, size/options, and quantity
Artwork
Asset ID/version/checksum, rights-review status, and design-preparation scope
Views
Annotated front/back/side/wrap or other relevant views with placements and dimensions
Personalization
Approved normalized data version/checksum, row count, warnings, and preview link
Estimate
Current accepted estimate/change version and any proof-dependent assumptions
Expiry
Approval deadline and triggers that require refreshed product, price, availability, or schedule review

Customer approval checklist

  • Products, quantities, sizes, colors, materials, and fulfillment groups are correct.
  • Spelling, names, numbers, dates, punctuation, capitalization, and row-to-item mappings are exact.
  • Artwork version, orientation, placement, dimensions, alignment intent, and approved views are correct.
  • Color intent, material/lot variation, texture, grain, coating, handmade/production tolerance, and care limitations are understood.
  • On-screen color is not a physical color guarantee, and drawings or mockups are not exact physical scale unless explicitly dimensioned.
  • The approver has authority for the customer or organization and understands that a material change creates a new proof and may change price or timing.
Approval action: The live workflow must show “Request changes” and “Approve proof [exact version]” as separate actions. Approval records authenticated identity, authority, timestamp/timezone, channel, displayed proof checksum, checklist/variation acknowledgment, IP/network evidence where proportionate, and the resulting production hold or release state. Silence, payment, an email attachment, or approval of an older version is not approval.

Request changes

Feedback is consolidated against the current version, categorized by affected product/view/data, and recorded with requester, authority, time, scope, cost or schedule impact, and owner.

Create the next version

The prior proof is never overwritten. Changed artwork, product, placement, dimension, quantity, personalization, material, method, or approved caveat creates a new immutable version and comparison.

Expire and supersede

Expired, replaced, held, declined, or takedown-affected proofs cannot be approved. Links and actions fail closed while the audit history remains readable to authorized users.

Release production

Proof approval alone is insufficient. Release also requires the current accepted estimate, cleared required deposit, rights/capability gates, allocated materials, approved personalization, schedule, and operator authorization.

Order communication

Know the current state, owner, and next action.

A future authenticated order view will show only customer-safe operational detail while preserving the exact evidence and accountability behind every transition.

Every displayed update includes: order reference, current state, status explanation, server timestamp and timezone, responsible role, completed evidence summary, next action, action owner, due or next-review time when applicable, and notification result. Sensitive supplier, security, payment, personal, or internal production data remains restricted.
Customer-visible custom order statuses and next actions
StatusCustomer-safe meaningOwner and next action
Request receivedWe received the request and are checking whether the details are complete. No price, product, method, or date is confirmed.Hays Custom Works reviews the request or asks for specific missing information.
Needs informationA named product, artwork, quantity, personalization, date, budget, rights, supplied-item, or fulfillment decision is missing.The named customer contact provides the listed information by the review date.
Capability reviewSource, material, method, equipment or partner, cost, capacity, safety, test, quality, and fulfillment feasibility are being checked.The assigned reviewer records proceed, clarify, alternative, hold, or decline.
Awaiting artworkUsable authorized artwork or an accepted design-preparation scope is still required.The customer supplies approved assets/evidence or accepts a quoted preparation service.
Quoted / estimate readyA current versioned estimate is ready; it is not accepted merely because it was viewed or emailed.The authorized customer accepts the exact version or requests a controlled change.
ProofingAn immutable proof is being prepared or revised from the accepted scope, approved assets, and controlled personalization data.The proof owner completes internal review and releases the exact version for customer review.
Awaiting approvalThe current proof, estimate, spelling, personalization, placements, quantities, and variation notices require authorized approval.The authorized customer approves exact versions or submits consolidated changes.
Awaiting depositA required deposit has not yet produced cleared, reconciled evidence for the accepted estimate/change version.The customer completes the approved payment path; billing verifies amount, currency, purpose, and status.
ScheduledRequired source/material, approvals, deposit, capacity, operator, and committed-date evidence are recorded.The production owner protects the scheduled slot and reports any risk before it becomes a silent delay.
In productionAuthorized work is following the released traveler, recipe, materials, equipment, operator, and in-process checks.The operator records good, test, rework, scrap, hold, and completion evidence.
Quality checkProduct/options, placement, personalization, quantity, finish, care, packaging, and release evidence are being reconciled.The quality owner releases conforming work or opens a documented correction or hold.
ReadyQuality, finishing, packaging, applicable balance, and the confirmed pickup, delivery, or shipping path are ready.The fulfillment owner provides the accepted handoff instructions and authorized-recipient requirements.
FulfilledPickup, delivery, or carrier custody evidence has been recorded; this does not erase a later loss, damage, or support exception.The fulfillment owner closes custody or opens the appropriate exception/support record.
On holdWork is stopped for a stated customer-safe reason, with known impact, containment, owner, and next review.The named owner resolves the blocking evidence or presents options; no silent production occurs.
CanceledThe authorized cancellation, production stage, materials, money, data, and notifications are being or have been reconciled.The cancellation owner records disposition, remaining balance or approved financial outcome, and closure.
RefundedAn approved refund event has been reconciled to the payment provider, estimate/change version, amount, currency, tax/accounting, and customer notice.Billing records final status; a refund does not silently reopen or erase the order history.

Truthful notifications

Email or another approved channel uses the same versioned customer-safe status message. Attempt, authorized recipient, delivery, bounce/failure, retry, and support fallback are recorded; a failed notification does not fake a completed update.

No skipped gates

Production cannot start before current estimate, proof, required deposit, materials, capacity, traveler, and authorization. Ready and Fulfilled require quality, packaging, balance, and custody evidence as applicable.

Exceptions stay visible

Delay, material failure, quality hold, payment conflict, access loss, shipment loss/damage, or other exception records containment, impact, options, owner, next update time, customer decision, and recovery.

History is never rewritten

Corrections and authorized overrides append new events that reference the earlier event, reason, evidence, authority, notice, and follow-up. Backward movement cannot erase what occurred.

Capacity and timing

A requested date becomes a commitment only after the work is schedulable.

The website collects the customer’s real need-by date, but it does not publish a universal turnaround or convert that request into a promise.

Evidence required before committing a custom-order completion date
Scheduling inputRequired evidenceCommitment effect
Customer needRequested need-by date and timezone, actual event/use date, consequence of a miss, destination, transit needs, flexibility, and approved contingency.Distinguishes the customer request from the internal target and externally committed date.
Exact scopeProducts/SKUs/options, quantity, personalization complexity, artwork/proof versions, method, test requirement, quality plan, packaging, and fulfillment.Prevents scheduling a vague inquiry or theoretical product idea.
Source and materialVerified supplier/partner, stock allocation, lead time/cutoff, lot/substitution rule, inbound freight, receiving inspection, and backup source.Sets the earliest date materials can safely enter production.
Approval and money gatesRights, estimate, proof, personalization, supplied-item risk, required deposit, tax decision, and change orders are current and accepted.Incomplete or expired gates keep the date tentative and production unreleased.
Real production capacitySetup, test, run, cure/cool/finish, QC, rework buffer, packaging, handoff hours, equipment/partner rate, authorized operator hours, maintenance, and existing queue.Produces a realistic internal target rather than using theoretical machine speed.
Family and continuityAssigned operator and backup, availability, training/authorization, holidays, other commitments, outage/illness contingency, and stop-taking-orders threshold.Protects the family from promises that depend on one unavailable person.
Fulfillment and bufferPickup window or delivery/carrier cutoff, packaging, address/destination splits, weather, transit, event buffer, loss/damage recovery time, and customer handoff.Separates production completion from the date the customer can reliably use the order.
Commitment decisionEarliest safe completion, internal target, customer commitment, confidence/risk, assumptions, rush decision, owner approval, acceptance, and next review.Creates one dated, timezone-aware commitment or a documented decline/alternative.

No universal turnaround

Two orders with the same quantity can require different sourcing, artwork, personalization, setup, testing, finishing, quality, packaging, and transit. Timing is stated only for the accepted order version.

Rush is a capacity decision

A rush request records the reason, cutoff, displaced capacity, overtime or partner dependency, added risk, shortened buffer, charge, affected orders, approval authority, and safe accept/decline decision. Paying more cannot waive safety or quality gates.

Changes trigger rescheduling

Product, quantity, artwork, proof, personalization, material, method, payment, equipment, staffing, safety, quality, destination, or carrier changes require impact review and a newly accepted commitment when the date changes.

Delays are communicated early

An at-risk or delayed event records cause, containment, affected scope, old/new forecast, customer-safe options, cost, owner, next update time, customer decision, and downstream fulfillment impact. Dates never move silently.

Timing boundary: “Requested,” “estimated,” “internal target,” and “committed” are different states. Only the current accepted commitment record authorizes customer-facing deadline language. Safety, rights, material, payment, proof, quality, weather, carrier, or other exceptions may still require a documented hold and recovery decision under the accepted terms.
Fulfillment and custody

Finish the order with one accepted handoff path.

Pickup, local delivery, and shipping are options only when the accepted estimate identifies the real location or service area, cost, timing, recipient, packaging, evidence, and recovery process.

Pickup

Authorized handoff at an approved location.

The order records a non-public or public approved location as appropriate, ready notice, appointment/window/timezone, support contact, authorized recipient, proportionate identity check, package/item count, condition, handoff signature/time, and care information.

Exceptions: no-show, reschedule, unsafe interaction, unclaimed-order retention, storage cost, abandonment/escalation, wrong recipient, count, or condition.

Local delivery

Defined area, fee, access, and recipient evidence.

The estimate records the verified delivery area, rate/fee, validated address, safe access and parking, date/window/timezone, do-not-leave rule, recipient/contact permission, driver or accountable courier, route custody, and accepted photo/signature evidence.

Exceptions: unsafe site, failed attempt, unavailable or wrong recipient, address/access error, delay, damage, redelivery cost, return, or refusal.

Shipping

Validated address, protective packaging, and tracking.

The order records customer-confirmed address/version, carrier/service and rate source, package IDs, dimensions/weight, packaging standard, declared value or insurance decision, tracking, handoff scan, delivery/signature requirement, split destinations, and expected transit—not a guaranteed carrier date.

Exceptions: address correction, delay, loss, damage, porch risk, refusal, return-to-sender, carrier claim evidence/deadline, replacement, credit, or refund review.

Every path

One custody record and complete reconciliation.

Released good quantity, QC, care, labels, packaging, seal/package IDs, custody owner, recipient authorization, promised/actual time, costs, balance gate, notification, handoffs, and final acceptance reconcile to the approved order.

Privacy: addresses, signatures, contact details, delivery photographs, identity evidence, and tracking access remain restricted and never enter public analytics or portfolio content.

Change control

Fulfillment changes affect price, schedule, and risk.

A changed method, location, address, recipient, destination split, package, carrier, service, declared value, timing, or pickup window creates a versioned review with cost, tax, capacity, privacy, and committed-date impact.

Release: no handoff occurs from an informal text, stale address, unpaid applicable balance, unresolved quality hold, or unauthorized recipient.

Current public boundary: Hays Custom Works has not published a customer pickup address, staffed pickup hours, fixed local-delivery area or fee, carrier rate, free-shipping claim, or universal delivery time. Those details appear only when verified and accepted for the specific order.
Fulfillment exception and recovery record
ExceptionRequired response
Missing, damaged, or wrong itemContain remaining packages, preserve condition/packaging photos and counts, notify the customer, identify custody point, assess repair/remake/replacement/credit/refund options, owner, cost, and deadline.
Delayed or lost handoffRecord last verified custody event, carrier/courier contact, claim ID and deadline, customer-safe update, event/use impact, replacement decision, new forecast, next update, and final disposition.
Address or recipient failureRestrict personal data, stop unsafe release, record validation evidence and failed attempt, obtain authorized correction, price/redelivery impact, customer acceptance, and new custody instructions.
Return or refusalRecord authority, reason, received condition/count, custody, private-data handling, restock/rework/scrap/return disposition, shipping/fee/tax impact, financial review, and closure.